**************************** ** Detector Stocks at ANU ** **************************** :PLEASE UPDATE AFTER EACH RUN ADD COMMENTS NEXT TO THE DETECTOR NUMBER: Updated 17/2/98 RLC NB The HAMAMATSU PSDs can be annealed! A high leakage (>2uA) does NOT mean these detectors are not worthy See RLC for details of annealing process STRIP DETECTORS *************** Hammamatsu PSSDs (straight pins) ------------------------------ No. Leakage Other Comments 3 0.9uA Tested Jan 96 >to York 14 Used Jan 96 13 Used Jan 96 23 0.5uA >to York 24 0.0uA >to York 27 0.3uA >to York 29 0.3uA >to York 30 0.7uA 2 strips missing >to York 6 history unknown 7 history unknown Hammamatsu PSSDs (right angle pins) ------------------------------- No. Leakage Other Commentsx 32 0.28uA Used Jan 98 34 0.88uA Used Jan 98 35 Used Jan/Feb 96 36 4.31uA Used Jan 98 37 3.98uA Used Jan 98 38 Used Jan/Feb 96 40 0.42uA Used Jan 98 41 Used Jan/Feb 96 43 0.72uA Used Jan 98 45 8.08uA Used Jan 98 46 0.08uA Used Jan 98 47 0.64uA Used Jan 98 48 4.23uA Used Jan 98 49 0.43uA Used Jan 98 50 7.04uA Used Jan 98 51 Used previously -history unknown 52 Used Jan96 and Oct 97 for tests 53 Used Jan96 and Oct 97 for tests 54 Used Jan96 and Oct 97 for tests 55 Used Jan96 and Oct 97 for tests Micron (1000um) --------------- No. Leakage Other Comments msl 990 15 2 strips missing (8,16) msl 990 16 msl 990 17 RESISTIVE SHEET 2D PSDs *********************** Hammamatsu 50x50 385T ----------------------- No. Leakage Other Comments 09 1.1uA used in central module & removed 12 1.1uA used in central module & removed 13 1.8uA used in central module & removed 15 1.9uA used in central module & removed 42 1.0uA used in central module & removed 25 central module 16 central module 27 central module 87 central module 28 central module 88 central module 31 central module 30 central module 08 0.2uA right module 18 0.1uA right module 20 0.0uA right module 32 0.1uA right module 33 0.1uA right module 34 0.1uA right module 36 0.1uA right module 37 0.2uA right module 38 0.1uA right module 43 0.0uA left OR top module 44 0.2uA left OR top module 45 0.0uA left OR top module 55 0.1uA left OR top module 56 0.0uA left OR top module 57 0.1uA left OR top module 59 0.1uA left OR top module 60 0.1uA left OR top module 61 0.0uA left OR top module *Confusion over where the above detectors are placed. The detector numbers in the other module (top or left) are unknown. 35 installed in down module 27/01/98 RLC 46 installed in down module 27/01/98 RLC 51 installed in down module 27/01/98 RLC 58 installed in down module 27/01/98 RLC 72 installed in down module 27/01/98 RLC 75 installed in down module 27/01/98 RLC 89 installed in down module 27/01/98 RLC 94 installed in down module 27/01/98 RLC 101 installed in down module 27/01/98 RLC 90 unused 91 unused 93 unused 95 unused 96 unused 97 unused 99 unused 100 unused 112 unused 113 unused - this PSD NOT at ANU (RLC/BJG) 114 unused 115 unused 98 history unknown, probably not used 102 history unknown, probably not used 104 5.59uA used 01/98 in strip array -> gone to York Feb 98 105 2.50uA used 01/98 in strip array - damaged? 106 5.55uA used 01/98 in strip array - damaged? 107 6.07uA used 01/98 in strip array -> gone to York Feb 98 108 5.92uA used 01/98 in strip array - damaged? 109 1.39uA used 01/98 in strip array - damaged? 110 4.55uA used 01/98 in strip array - damaged? 111 5.47uA used 01/98 in strip array - damaged? CsI SCINTILLATORS ***************** Some scintillators are in the modules the numbers are required from CDF & GKD There are eight high gain scintillator preamps available in ANU No. Comments 04 Stored in control room no pre-amp chip 06 Stored in control room no pre-amp chip 10 Stored in control room 16 Stored in control room 20 installed in module DOWN (no. 5) 27/01/98 by RLC 23 Stored in control room 25 Stored in control room no pre-amp chip 28 installed in module DOWN (no. 5) 27/01/98 by RLC 29 installed in module DOWN (no. 5) 27/01/98 by RLC 36 installed in module DOWN (no. 5) 27/01/98 by RLC 38 installed in module DOWN (no. 5) 27/01/98 by RLC 44 Stored in control room SSF476 Stored in control room (2nd Batch) SSF469 installed in module DOWN (no. 5) 27/01/98 by RLC (2nd Batch) SSF473 Stored in control room (2nd Batch) SSF474 Stored in control room (2nd Batch) SSF475 installed in module DOWN (no. 5) 27/01/98 by RLC (2nd Batch) SSF476 installed in module DOWN (no. 5) 27/01/98 by RLC (2nd Batch) SSF477 installed in module DOWN (no. 5) 27/01/98 by RLC (2nd Batch) SSF478 Stored in control room (2nd Batch) Double Sided Strip Detectors ***************************** 16 strip Micron detectors (straight pinned) No. Thickness Bias Comments MSL-990-15 1006um 90V 8, 16 strips missing Feb 96 MSL-990-16 1019um 87V Feb 96 MSL-990-17 987um 93V Feb 96